Buying LED bulbs direct from a factory in China can give you better prices, your own brand, and supply formats that fit your market. It can also go wrong in predictable ways: the wrong base type, a driver that does not suit your voltage, or packaging that your customers do not trust.
This guide walks importers, distributors and local assemblers through the ordering process step by step — what to decide, what to confirm in writing, and what to check before you pay for a shipment. It is based on how we work with buyers across Africa, India, the Middle East and Southeast Asia at MUYI, a LED bulb factory in China, based in Zhongshan, Guangdong.
Step 1: Choose the product — and the supply format
Start with the product, but do not stop there. The same LED bulb can usually be supplied in three formats:
- Finished products — fully assembled, tested and packed, ready for your shelves. The fastest and simplest route.
- SKD kits (semi-knocked-down) — ready-made sub-assemblies that your team finishes locally with basic tools.
- CKD parts (completely-knocked-down) — every component supplied separately, for full assembly in your own factory.
Finished products suit distributors who want speed. SKD and CKD suit buyers who want lower import duties, local-assembly status, or more control over their own brand. If you are deciding between them, read our guide to SKD vs CKD LED bulbs before you request a quotation — the format changes the price structure, not just the packing.
At MUYI the range covers LED bulbs, UFO lights, panel lights, downlights, LED modules and ceiling lights, from 3W to 200W. You can review the full range on our products page and note the exact models you want to price.
Step 2: Confirm the specifications in writing
Most ordering problems are specification problems. Before you ask for a final price, confirm at least the following for each model:
- Wattage and brightness — which wattages you will stock, and the luminous flux for each one
- Base type — E27 screw or B22 bayonet, depending on what homes in your market actually use
- Input voltage and driver type — for example linear, DOB or constant-current (IC) drivers, matched to how stable your local power supply is
- Colour temperature (CCT) — warm white around 3000K, daylight around 6500K, or other options your customers ask for
- Colour rendering (CRI) — standard or higher-CRI versions, depending on whether you sell on price or on light quality
- Materials and size — housing material and dimensions, so the product fits the fittings and shelves in your market
Take our A Bulb as an example of how these choices look in practice: wattages from 5W to 25W, E27 as the standard base with B22 available, and several driver and voltage options. There is no single “right” combination — there is only the right combination for your market. A good factory will help you choose; a careless one will just sell you its default.
Step 3: Test samples before you commit to volume
Never place a bulk order for a model you have not handled. Order samples first and test them the way your customers will use them: in a real fitting, on your local voltage, for long enough to notice heat, flicker or early failures.
Check the light quality with your own eyes, confirm the base fits common local holders, and make sure the product you tested is the product that will be produced for you. Keep one approved sample on your side — it is your reference if a later shipment is ever in dispute.
Step 4: Check the MOQ and get a complete quotation
Every factory has a minimum order quantity, and it is better to hear it early than after you have planned your range around a model you cannot fill.
At MUYI, the minimum order quantity is 1,000 pcs per product, and our lead time is 7 days.
To get an accurate quotation, send the factory:
- The product names or model codes you want
- The quantity for each model
- The supply format — finished, SKD or CKD
- Your destination port
With those four pieces of information, we reply with a quotation within 24 hours on business days. If a quotation looks unusually cheap, check what it excludes: packaging, OEM printing, and freight are the three areas where “cheap” quotes quietly change.
Step 5: Decide on OEM branding and packaging
If you are building your own brand, this is the step that creates its value. Decide early:
- Your logo printed on the bulb and on the box
- Your packaging design, languages and barcode
- The specifications printed on the packaging — these must match the product inside
At MUYI, OEM orders are welcome across the range: your brand, your packaging, your specifications. Send your artwork or brand information at the quotation stage, not after production has started, so branding does not slow your order down. You can read more on our OEM page.
Step 6: Production, inspection and the 7-day lead time
Once the order and specifications are confirmed, production begins. Our lead time is 7 days — one more reason to have your specifications and artwork final before you confirm, because changes mid-production cost more time than they save.
Before shipment, agree on how quality will be checked. Sensible checks include:
- Quantity and model mix against the order
- Appearance, base and printing on finished units
- Light-up and function testing on sampled units
- Packaging and carton condition before loading
You can see where and how our products are made on our factory page — production workshops, assembly lines and container loading in Zhongshan.
Step 7: Shipping and delivery to your port
Finally, confirm the shipping details in writing: destination port, packing quantities per carton, and who arranges each leg of the freight. Finished bulbs take more volume than SKD kits or CKD parts, which pack more densely — on high-volume orders this difference alone can change your landed cost, and it is worth calculating before you choose a format, not after.
When your goods arrive, inspect a sample of cartons against your approved sample and your order before the stock goes out to your customers.
Ordering from MUYI: the short version
- Range: LED bulbs, UFO lights, panel lights, downlights, LED modules and ceiling lights, 3W–200W
- Formats: finished products, SKD kits and CKD parts
- OEM: your brand and your packaging welcome
- MOQ: 1,000 pcs per product
- Lead time: 7 days
- Quotation: reply within 24 hours on business days
Tell us the products, quantities and your destination port, and we will quote you for the format that fits your market — finished, SKD or CKD. Send your inquiry on our contact page.

